Stages, zones & structure
What it's for
Before you import inventory or draw maps, give the project its catalogue: the stages units move through, the unit types / zones you group them by, the partner firms that own them and, on multi-map projects, the section tree. The import and the map editor only accept names that already exist here, so setting them up first avoids most errors.
Before you start
- You need permission to edit the project's settings or to manage its inventory.
- The project exists — see Create a project.
Recommended order
- Inventory defaults (project Edit tab) — default unit type, area unit, default cost per area unit, primary price label.
- Inventory stages tab — keep or rename Available, Hold and Sold; add your own steps.
- Unit type / Zones tab — labels such as 3 BHK or Corner, with optional rates.
- Ownership companies tab — only for JV or land-owner projects.
- Multi map structure tab — multi-map projects only: towers, floors, phases.
- Then import inventory and add site maps.
Inventory stages
New projects start with Available (no colour), Hold (orange) and Sold (red). Add stages such as "Reserved" or "Under negotiation", choose colours with some transparency so unit numbers stay readable, and rename the defaults if you like. CSV stage_name values must match exactly. Full guide: Inventory stages & colours.
Unit types / zones
Your own groupings — 3 BHK, Corner plot, Premium row. A unit can have several. They drive buyer filters, sales layout zone colours, stats and plan images, and can carry a cost per area unit for price calculation. CSV column: zone_names separated by |. Full guide: Unit types, zones & rates.
Not to be confused with Unit type (plot, flat, villa, shop…), a fixed list set per unit with a project default.
Ownership companies
Partner or JV firms that own units, each with its own colour per stage for the sales layout's Ownership view. CSV column: ownership_company_names. Full guide: Ownership companies.
Preferential Location Charges (PLC)
Special attributes of units (such as Corner, Park Facing, Wide Road) that command premium charges or attract specific buyer demand. Managed under Project → Location charges (PLC). CSV column: plc_names separated by |.
Multi map structure
The section tree shared by inventory and maps, for example Tower A > Floor 2. Build it before importing and before adding site maps, because each map is assigned to a section when added. Use Copy section path for CSV import to fill section_path. Full guides: Sections & structure and Section paths.
Other project settings
- Edit tab — description, status, public URL slug, cover image, public access and display settings, contacts, location, price currency.
- Location map tab — satellite view and overlays. See Location map.
- Manage access tab — project permissions for members. See Team members & permissions.
- Media library — Project media & documents.
Tips and common questions
- A stage, zone or ownership company in use cannot be removed until units no longer use it (custom stages are the exception: their units move to Available).
- Names are case-sensitive in CSV files; copy them from these tabs.
- You can add to the catalogue at any time; existing units are not affected.
Related: Create a project · CSV import guide · Onboarding checklist