Build and publish a rate card
What it's for
The rate card is the single source of prices for a project. You build it as a draft, check its effect on every unit, and publish it from a date. Published cards cannot be changed, so any quote or booking can always be traced back to the exact card it used.
Before you start
- Permission to manage pricing (drafts) and to publish, for the project.
- Tax codes from your country pack (Finance → Country & tax).
- Unit areas filled in for the area measure you price on.
Create the card
- Open Sales → Pricing & cost sheets and the project.
- Press New rate card (or Create draft from current prices the first time, or New version on a published card).
- Set Currency (any currency, for example USD for a TZS company), In force from, Prices the (plot, carpet, built-up or super built-up area), Rates per (the area unit the rates are in; areas are converted from the project unit) and Tax on base price (or No tax).
- Press Create draft.
Enter rates
- Pick a price option tab above the rates grid (Public, EOI, Launch …). Each tab shows its number of rates.
- Press Add rate, choose the Level — project, zone, unit type, block / tower / floor, or a single unit — and what it Applies to, then the rate. Zones have a Priority when they overlap.
- Press Save rates. The most specific rate wins for each unit: single unit, then block / tower / floor (and the blocks above it), then unit type, then zone (highest priority first), then project.
- To fill an empty option fast, use Copy rates from another option with a Change % — see Price options.
Add premiums
- Under Premiums (PLC, floor rise), press Add premium.
- Name it and choose When the unit is: PLC (location charge), corner, a facing, in zones, of unit types, in blocks / towers / floors, above a floor (Starts above floor, for floor rise), with an Attribute and Values (for example
view = park, lake), or every unit.
- Choose Amount is: per area, % of base or fixed. Add a Cap (optional).
- Limit it with Only for these price options (none = all) if needed, then Save premium.
Add charges
- Under Charges, press Add charge.
- Give a Code and name, and the Category: price component, statutory pass-through (stamp duty, registration) or deposit.
- Choose how it is worked out: fixed, per area, % of base, % of agreement value, or % of another charge (Of charge).
- Pick its Tax code. Tick Buyer chooses for optional charges, or limit it to Some units (zones, unit types, blocks).
- Save charge.
Check the impact
Press Preview impact. It prices every unit with this draft and shows units priced, units that cannot be priced (for example a missing carpet area), price changes against today's public price and the average change, with sample units.
Publish
- Save any unsaved rates first, then press Publish.
- A dry run opens: the start date, which card it replaces, how many public prices refresh, the average change, and units priced and not priced per active option.
- Fix unpriced units if you need them, then press Publish in the dialog.
What happens automatically
- A card in force from today or earlier replaces the current card at once; a future-dated card takes over on that day.
- Public unit prices are refreshed from the default public option.
- Once a card is used by a cost sheet, quotation or booking it is shown In use (locked), together with its tax codes.
Tips and common questions
- "This card is locked." Published and in-use cards cannot be edited — press New version for a draft copy with every rate, premium and charge.
- A charge loop is reported. Two charges are each a % of the other; change one of them.
- Archive takes a card you no longer need out of the list of working cards.
Related: Pricing overview · Quote a unit